FEED Upgrading Produced Water Treatment Field Tanjung Capacity 90.000 BFPD
Feb 7, 2015
PT. Pertamina EP Asset 5
Description :
PT.Pertamina EP Asset 5 intends carrying out the work "Development Produced Water Treatment Plant (WTP) Capacity 90,000 BWPD in Field Tanjung as a means to improve the quality of produced water generated from wells on the field Tanjung to be injected into the reservoir according to the requirements determined.
Scope of Work :
Scope of work of contractor to prepare FEED (Front End Engineering Design) of produced water treatment with capacity 90.000 BFPD as below :
- FEED Engineering Document
- EPC Schedule Estimate
- EPC Bid Document Package
- EPC Cost Estimate
Drawing etc***
News
- Procurement of Third Party Contract (TPC) Employment Services For the development of the Jambaran - Tiung Biru Field,PT.Pertamina EP Cepu
- PMC Development of Production Facilities, Flowline, And Trunkline Cikarang – Tegalpacing Development Project, PT PERTAMINA EP.
- Updated Feed & PMC Sugar Factory Assembagoes and Djatiroto – PTPN XI
- PMC Rembang Project - Semen Gresik
- PMC OF EAST JAVA GAS PIPELINE OFFSHORE LINE SPAN RECTIFICATION PROJECT - EJGP
- Assisting Service for BSRU Unit Central Processing Plant (CPP) Operation on Gundih Area,PPGJ
- Engineering Service For Rembang Project
- PMC PT. Pertamina EP Asset 5
- FEED Upgrading Produced Water Treatment Field Tanjung Capacity 90.000 BFPD
- PMC Perta-Samtan NGL Plant
- PMC Gundih Gas Processing Plant
- PMC and Engineering Services for PHE ONWJ Offshore Platform Onshore Facility
- FEED Elnusa Bangkanai
- PMC and Engineering Upgrading 400 km 36" East Java Gas P/L
- FEED Matindok Gas Production Facilities
- Feed & PMC Jabung Gas Booster Station
- FEED Pondok Makmur