FEED Upgrading Produced Water Treatment Field Tanjung Capacity 90.000 BFPD

PT. Pertamina EP Asset 5

Description :
PT.Pertamina EP Asset 5 intends carrying out the work "Development Produced Water Treatment Plant (WTP) Capacity 90,000 BWPD in Field Tanjung as a means to improve the quality of produced water generated from wells on the field Tanjung to be injected into the reservoir according to the requirements determined.
Scope of Work :
Scope of work of contractor to prepare FEED (Front End Engineering Design) of produced water treatment with capacity 90.000 BFPD as below :
- FEED Engineering Document
- EPC Schedule Estimate
- EPC Bid Document Package
- EPC Cost Estimate
Drawing etc***